Intent:
- Provide a comfortable thermal environment supporting productivity and well-being of building occupants.
Implementation:
- Design HVAC systems and Building Envelope per ASHRAE 55-2004.
- Evaluate air temp. radiant temp, air speed, relative humidity
- Coordinate with EQ P1. EQ 1, & EQ 2.
Code:
- ASHRAE 55-2004: Thermal Comfort Conditions for Human Occupancy
Submittal Phase:
- design
Indoor Environmental Air Quality
- EQ P1 – Minimum IAQ Performance (prerequisite)
- EQ P2 – Environmental Tobacco Smoke (ETS) Control (prerequisite)
- EQ 1 – Outdoor Air Delivery Monitoring
- EQ 2 – Increased Ventilation
- EQ 3.1 – Construction IAQ Management Plan, During Construction
- EQ 3.2 – Construction IAQ Management Plan, Before Occupancy
- EQ 4.1 – Low-Emitting Materials, Adhesives & Sealants
- EQ 4.2 – Low-Emitting Materials, Paint & Coatings
- EQ 4.3 – Low-Emitting Materials, Carpet Systems
- EQ 4.4 – Low-Emitting Materials, Composite Wood & Agrifiber Products
- EQ 5 – Indoor Chemical & Pollutant Source Control
- EQ 6.1 – Controllability of Systems, Lighting
- EQ 6.2 – Controllability of Systems, Thermal Comfort
- EQ 7.1 – Thermal Comfort, Design
- EQ 7.2 – Thermal Comfort, Verification
- EQ 8.1 -Daylight & Views, Daylight 75% of Spaces
- EQ 8.2 – Daylight & Views, Views for 90% of Spaces






3 Comments On This Post
Can anyone point me to the right direction? i am looking for the information pertaining to the duties of the LEED Admistrator and waht can and can’t be done/completed online i had about 4 of these questions on my exam on Saturday.
Thanks in advance
HAs any one used exam secrets from Morrison Media, LLC good or no good?
Thanks in advance
how do you calculate the humidity level in the space at low cooling load conditions.