<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: How About All About LEED Submittal Documentation</title>
	<atom:link href="http://www.greenexamacademy.com/submittal-documentation/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.greenexamacademy.com/submittal-documentation/</link>
	<description>The Best Resource For Anyone Who Wants to Pass the LEED AP Exam. Over 100,000 Served and Counting!</description>
	<lastBuildDate>Mon, 06 Sep 2010 06:58:11 -0600</lastBuildDate>
	<generator>http://wordpress.org/?v=2.8</generator>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<xhtml:meta xmlns:xhtml="http://www.w3.org/1999/xhtml" name="robots" content="noindex" />
	<item>
		<title>By: Pat</title>
		<link>http://www.greenexamacademy.com/submittal-documentation/#comment-3342</link>
		<dc:creator>Pat</dc:creator>
		<pubDate>Wed, 14 Oct 2009 04:38:56 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/?p=446#comment-3342</guid>
		<description>Amer, 

The CxA is absolutely for the Energy and Atmosphere prerequisite (fundamental), and they have duties such as developing a commissioning plan, reviewing the Basis of Design (BOD) and Owner&#039;s Project Requirements (OPR), verifying installation and performance of systems, and completing a summary. The LEED AP, although not absolutely required, earns a point for IDc2, and it would be silly not to use one because it&#039;s so easy to earn that point, and the LEED AP helps everyone understand and know their role in the LEED application process.</description>
		<content:encoded><![CDATA[<p>Amer, </p>
<p>The CxA is absolutely for the Energy and Atmosphere prerequisite (fundamental), and they have duties such as developing a commissioning plan, reviewing the Basis of Design (BOD) and Owner&#8217;s Project Requirements (OPR), verifying installation and performance of systems, and completing a summary. The LEED AP, although not absolutely required, earns a point for IDc2, and it would be silly not to use one because it&#8217;s so easy to earn that point, and the LEED AP helps everyone understand and know their role in the LEED application process.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: amer almadidy</title>
		<link>http://www.greenexamacademy.com/submittal-documentation/#comment-3333</link>
		<dc:creator>amer almadidy</dc:creator>
		<pubDate>Sat, 10 Oct 2009 13:14:29 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/?p=446#comment-3333</guid>
		<description>Pat
Thanks for the info posted on this page..I have question:
for LEED NC, do I need to hire both LEED AP and CxA...Briefly what is the role and duties of each of them?

Thanks</description>
		<content:encoded><![CDATA[<p>Pat<br />
Thanks for the info posted on this page..I have question:<br />
for LEED NC, do I need to hire both LEED AP and CxA&#8230;Briefly what is the role and duties of each of them?</p>
<p>Thanks</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Kimberly</title>
		<link>http://www.greenexamacademy.com/submittal-documentation/#comment-3159</link>
		<dc:creator>Kimberly</dc:creator>
		<pubDate>Sat, 01 Aug 2009 20:00:53 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/?p=446#comment-3159</guid>
		<description>In WE Online Credit Template 3.1/3.2 the # of Design Case flow fixtures is limited to 8; our project has more that 8. How do you add more fixtures to accurately portray design case?</description>
		<content:encoded><![CDATA[<p>In WE Online Credit Template 3.1/3.2 the # of Design Case flow fixtures is limited to 8; our project has more that 8. How do you add more fixtures to accurately portray design case?</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Jubran</title>
		<link>http://www.greenexamacademy.com/submittal-documentation/#comment-2864</link>
		<dc:creator>Jubran</dc:creator>
		<pubDate>Wed, 24 Jun 2009 07:52:20 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/?p=446#comment-2864</guid>
		<description>A practice test I&#039;m taking (Meghan Peot and Brennan Schumacher, question #65) says that &quot;the LEED Online Credit Template is divided into the following four sections: Template Status, Manage Template, Required Documents, Documentation Status&quot;. 

Is this correct and where can I find more information about the structure and content of the online credit templates? Thanks!</description>
		<content:encoded><![CDATA[<p>A practice test I&#8217;m taking (Meghan Peot and Brennan Schumacher, question #65) says that &#8220;the LEED Online Credit Template is divided into the following four sections: Template Status, Manage Template, Required Documents, Documentation Status&#8221;. </p>
<p>Is this correct and where can I find more information about the structure and content of the online credit templates? Thanks!</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: John Tomaszewski</title>
		<link>http://www.greenexamacademy.com/submittal-documentation/#comment-2798</link>
		<dc:creator>John Tomaszewski</dc:creator>
		<pubDate>Fri, 19 Jun 2009 15:35:44 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/?p=446#comment-2798</guid>
		<description>For the SS-8 Light Tresspass Credit, what formal documentation is required to be submitted and what are the parameters to comply?</description>
		<content:encoded><![CDATA[<p>For the SS-8 Light Tresspass Credit, what formal documentation is required to be submitted and what are the parameters to comply?</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Jess</title>
		<link>http://www.greenexamacademy.com/submittal-documentation/#comment-2738</link>
		<dc:creator>Jess</dc:creator>
		<pubDate>Fri, 12 Jun 2009 20:47:54 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/?p=446#comment-2738</guid>
		<description>I&#039;m not sure where to post this question, but the practice exam I am taking asks about &quot;critical decision points&quot;. What are these and where is this defined?

Example Q:
Which Indoor Environmental Quality credits have critical decision points prior to construction? (Choose two.)

EQ Prerequisite 1, Minimum IAQ Performance
EQ Prerequisite 2, Environmental Tobacco Smoke (ETS) Control
EQ Credit 2, Increased Ventilation
EQ Credit 5, Indoor Chemical and Pollutant Source Control
Solution:
The answer is B and D.

Only EQ Prerequisite 2, Environmental Tobacco Smoke (ETS) Control, and EQ Credit 5, Chemical and Pollutant Source Control, have critical decision points prior to the construction phase of a project. EQ Prerequisite 1, Minimum IAQ Performance, and EQ Credit 2, Increased Ventilation, have periods of activity prior to construction, but no critical decision points.</description>
		<content:encoded><![CDATA[<p>I&#8217;m not sure where to post this question, but the practice exam I am taking asks about &#8220;critical decision points&#8221;. What are these and where is this defined?</p>
<p>Example Q:<br />
Which Indoor Environmental Quality credits have critical decision points prior to construction? (Choose two.)</p>
<p>EQ Prerequisite 1, Minimum IAQ Performance<br />
EQ Prerequisite 2, Environmental Tobacco Smoke (ETS) Control<br />
EQ Credit 2, Increased Ventilation<br />
EQ Credit 5, Indoor Chemical and Pollutant Source Control<br />
Solution:<br />
The answer is B and D.</p>
<p>Only EQ Prerequisite 2, Environmental Tobacco Smoke (ETS) Control, and EQ Credit 5, Chemical and Pollutant Source Control, have critical decision points prior to the construction phase of a project. EQ Prerequisite 1, Minimum IAQ Performance, and EQ Credit 2, Increased Ventilation, have periods of activity prior to construction, but no critical decision points.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Jeff Poritzky</title>
		<link>http://www.greenexamacademy.com/submittal-documentation/#comment-2719</link>
		<dc:creator>Jeff Poritzky</dc:creator>
		<pubDate>Thu, 11 Jun 2009 17:49:07 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/?p=446#comment-2719</guid>
		<description>Thank you for this list. Is there one for Commercial Interiors? There seems to be a lot of difference between the credits in the LEED for NC categories and the LEED CI categories.
Your site is great. My CI exam is 6/13/09 and I&#039;m trying to be ready.
Thanks again,
Jeff</description>
		<content:encoded><![CDATA[<p>Thank you for this list. Is there one for Commercial Interiors? There seems to be a lot of difference between the credits in the LEED for NC categories and the LEED CI categories.<br />
Your site is great. My CI exam is 6/13/09 and I&#8217;m trying to be ready.<br />
Thanks again,<br />
Jeff</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: TomL</title>
		<link>http://www.greenexamacademy.com/submittal-documentation/#comment-2521</link>
		<dc:creator>TomL</dc:creator>
		<pubDate>Wed, 13 May 2009 11:18:46 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/?p=446#comment-2521</guid>
		<description>That is exactly what I was looking for too.  It wasn&#039;t in your LEED AP walkthrough and the practice tests I have been taking have been asking a lot of questions about it.</description>
		<content:encoded><![CDATA[<p>That is exactly what I was looking for too.  It wasn&#8217;t in your LEED AP walkthrough and the practice tests I have been taking have been asking a lot of questions about it.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: ChrisS</title>
		<link>http://www.greenexamacademy.com/submittal-documentation/#comment-2433</link>
		<dc:creator>ChrisS</dc:creator>
		<pubDate>Tue, 21 Apr 2009 19:19:50 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/?p=446#comment-2433</guid>
		<description>PAT - 

Thank you for this truly amazing resource for all of us.  I for one would be freaking even more about this crazy exam without it.

I have a question about CDVR: Corrected Design Ventilation Rate.  How does one calculate the design ventilation rate against the air-change rate.  Can you provide an example?  I don&#039;t get it.

Thank you-</description>
		<content:encoded><![CDATA[<p>PAT &#8211; </p>
<p>Thank you for this truly amazing resource for all of us.  I for one would be freaking even more about this crazy exam without it.</p>
<p>I have a question about CDVR: Corrected Design Ventilation Rate.  How does one calculate the design ventilation rate against the air-change rate.  Can you provide an example?  I don&#8217;t get it.</p>
<p>Thank you-</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Sara</title>
		<link>http://www.greenexamacademy.com/submittal-documentation/#comment-2431</link>
		<dc:creator>Sara</dc:creator>
		<pubDate>Tue, 21 Apr 2009 16:41:15 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/?p=446#comment-2431</guid>
		<description>Paul -- Design submittal occurs once you have &quot;100% Construction Documents&quot; completed. Construction is once you have completed the remaining credits. Letter templates are filled out on an ongoing basis; however, they are not submitted as such, they must be submitted either as a split review with one design phase review and one construction phase review, or as one combined design &amp; construction phase review. 
Hope this helps and didn&#039;t confuse you more.</description>
		<content:encoded><![CDATA[<p>Paul &#8212; Design submittal occurs once you have &#8220;100% Construction Documents&#8221; completed. Construction is once you have completed the remaining credits. Letter templates are filled out on an ongoing basis; however, they are not submitted as such, they must be submitted either as a split review with one design phase review and one construction phase review, or as one combined design &amp; construction phase review.<br />
Hope this helps and didn&#8217;t confuse you more.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Paul</title>
		<link>http://www.greenexamacademy.com/submittal-documentation/#comment-2427</link>
		<dc:creator>Paul</dc:creator>
		<pubDate>Mon, 20 Apr 2009 18:58:22 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/?p=446#comment-2427</guid>
		<description>When does the design submittal start and the construction submittal start, esp. if you are going with two submittal stages in lieu of one? Does the construction submittal stage come at the end of the project or is it progressive as construction moves forward?

Thanks</description>
		<content:encoded><![CDATA[<p>When does the design submittal start and the construction submittal start, esp. if you are going with two submittal stages in lieu of one? Does the construction submittal stage come at the end of the project or is it progressive as construction moves forward?</p>
<p>Thanks</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Zach</title>
		<link>http://www.greenexamacademy.com/submittal-documentation/#comment-2024</link>
		<dc:creator>Zach</dc:creator>
		<pubDate>Tue, 17 Mar 2009 22:59:55 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/?p=446#comment-2024</guid>
		<description>Ed &amp; Matt,

All submittals (template + supporting docs) go through LEED-Online.

-LEEDTeacher</description>
		<content:encoded><![CDATA[<p>Ed &amp; Matt,</p>
<p>All submittals (template + supporting docs) go through LEED-Online.</p>
<p>-LEEDTeacher</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Matt Brophy</title>
		<link>http://www.greenexamacademy.com/submittal-documentation/#comment-1833</link>
		<dc:creator>Matt Brophy</dc:creator>
		<pubDate>Mon, 09 Mar 2009 19:04:47 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/?p=446#comment-1833</guid>
		<description>I am being asked to provide the information pertaing to MRc7 . I am told there is a templet form I need to add this to, my question is where do I get such a form ? 

Matt Brophy 
Kempf building Materials</description>
		<content:encoded><![CDATA[<p>I am being asked to provide the information pertaing to MRc7 . I am told there is a templet form I need to add this to, my question is where do I get such a form ? </p>
<p>Matt Brophy<br />
Kempf building Materials</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Ed Taylor</title>
		<link>http://www.greenexamacademy.com/submittal-documentation/#comment-1692</link>
		<dc:creator>Ed Taylor</dc:creator>
		<pubDate>Wed, 25 Feb 2009 13:38:30 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/?p=446#comment-1692</guid>
		<description>How do you physically submit these additional documents to USGBC? I understand the template submissions required but do not see a way to upload additional documentation.

ET</description>
		<content:encoded><![CDATA[<p>How do you physically submit these additional documents to USGBC? I understand the template submissions required but do not see a way to upload additional documentation.</p>
<p>ET</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Mina</title>
		<link>http://www.greenexamacademy.com/submittal-documentation/#comment-1583</link>
		<dc:creator>Mina</dc:creator>
		<pubDate>Tue, 03 Feb 2009 16:06:04 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/?p=446#comment-1583</guid>
		<description>Pat,
thanks for providing this information, i was one of the people that wanted to see this on your website too. 
For SSP1 how come we are supposed to show it in the CDs instead of possibly just showing images like required in EQ3.1? I don&#039;t really remember showing temporary construction things on our architectectural sets..? 
not sure if im understanding it correctly...</description>
		<content:encoded><![CDATA[<p>Pat,<br />
thanks for providing this information, i was one of the people that wanted to see this on your website too.<br />
For SSP1 how come we are supposed to show it in the CDs instead of possibly just showing images like required in EQ3.1? I don&#8217;t really remember showing temporary construction things on our architectectural sets..?<br />
not sure if im understanding it correctly&#8230;</p>
]]></content:encoded>
	</item>
</channel>
</rss>
