	<title>Comments on: Indoor Environmental Air Quality 3.2 &#8211; Construction IAQ Management Plan &#8211; Before Occupancy</title>
	<atom:link href="http://www.greenexamacademy.com/eq3-2/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.greenexamacademy.com/eq3-2/</link>
	<description>The Best Resource For Anyone Who Wants to Pass the LEED AP Exam. Over 100,000 Served and Counting!</description>
	<lastBuildDate>Wed, 01 Feb 2012 18:30:13 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.0.4</generator>
<xhtml:meta xmlns:xhtml="http://www.w3.org/1999/xhtml" name="robots" content="noindex" />
	<item>
		<title>By: Kumar</title>
		<link>http://www.greenexamacademy.com/eq3-2/#comment-3049</link>
		<dc:creator>Kumar</dc:creator>
		<pubDate>Mon, 06 Jul 2009 09:13:37 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/eq3-2/#comment-3049</guid>
		<description>Hi Pat

IEQ 3.2 Option 2: Before Occupancy - Air Quality testing

For IAQ testing if EPA is not known in India, can we follow NIOSH/ OSHA procedures. (for LEED CI)

Kumar</description>
		<content:encoded><![CDATA[<p>Hi Pat</p>
<p>IEQ 3.2 Option 2: Before Occupancy &#8211; Air Quality testing</p>
<p>For IAQ testing if EPA is not known in India, can we follow NIOSH/ OSHA procedures. (for LEED CI)</p>
<p>Kumar</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Tim</title>
		<link>http://www.greenexamacademy.com/eq3-2/#comment-3048</link>
		<dc:creator>Tim</dc:creator>
		<pubDate>Sat, 04 Jul 2009 00:22:52 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/eq3-2/#comment-3048</guid>
		<description>&quot;During flush out…
NO CLEANING
NO PUNCH LIST

COMMISSIONING OK IF NO ADDITIONAL CONTAMINANTS ARE INTRODUCED INTO THE BUILDING&quot;

I changed my answer last minute to Commisioning.

Took the 6PM test on June 30th and passed with a 179. May be one of the last to earn LEED NC v2.2. Thanks for all the info Pat. You&#039;ve done a great job. Your hiatus is well deserved!</description>
		<content:encoded><![CDATA[<p>&#8220;During flush out…<br />
NO CLEANING<br />
NO PUNCH LIST</p>
<p>COMMISSIONING OK IF NO ADDITIONAL CONTAMINANTS ARE INTRODUCED INTO THE BUILDING&#8221;</p>
<p>I changed my answer last minute to Commisioning.</p>
<p>Took the 6PM test on June 30th and passed with a 179. May be one of the last to earn LEED NC v2.2. Thanks for all the info Pat. You&#8217;ve done a great job. Your hiatus is well deserved!</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Allison</title>
		<link>http://www.greenexamacademy.com/eq3-2/#comment-3047</link>
		<dc:creator>Allison</dc:creator>
		<pubDate>Fri, 03 Jul 2009 14:59:28 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/eq3-2/#comment-3047</guid>
		<description>Hi Pat-  I passed my exam as well.  Thank you SOOO MUCH for this incredible site :)

-Ali</description>
		<content:encoded><![CDATA[<p>Hi Pat-  I passed my exam as well.  Thank you SOOO MUCH for this incredible site <img src='http://www.greenexamacademy.com/wp-includes/images/smilies/icon_smile.gif' alt=':)' class='wp-smiley' /> </p>
<p>-Ali</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: raha</title>
		<link>http://www.greenexamacademy.com/eq3-2/#comment-3046</link>
		<dc:creator>raha</dc:creator>
		<pubDate>Thu, 02 Jul 2009 21:29:30 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/eq3-2/#comment-3046</guid>
		<description>Hi Pat, I passed my exam for LEED CI on June30th. I have to thank you and this great website that got me started and kept me going.</description>
		<content:encoded><![CDATA[<p>Hi Pat, I passed my exam for LEED CI on June30th. I have to thank you and this great website that got me started and kept me going.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: lule</title>
		<link>http://www.greenexamacademy.com/eq3-2/#comment-3043</link>
		<dc:creator>lule</dc:creator>
		<pubDate>Thu, 02 Jul 2009 14:38:44 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/eq3-2/#comment-3043</guid>
		<description>hi! I passed the exam, Pat, thanks a lot for such a great web site.
Lots of questions about leed administrative process, more than expected...
Thanks Pat!</description>
		<content:encoded><![CDATA[<p>hi! I passed the exam, Pat, thanks a lot for such a great web site.<br />
Lots of questions about leed administrative process, more than expected&#8230;<br />
Thanks Pat!</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Sachin B</title>
		<link>http://www.greenexamacademy.com/eq3-2/#comment-3042</link>
		<dc:creator>Sachin B</dc:creator>
		<pubDate>Thu, 02 Jul 2009 13:20:11 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/eq3-2/#comment-3042</guid>
		<description>How to manage the ventilation rate of 0.30cfm/sq.ft for occupied flush-out.
When i should believe the flush-out is completed for a building for both options.</description>
		<content:encoded><![CDATA[<p>How to manage the ventilation rate of 0.30cfm/sq.ft for occupied flush-out.<br />
When i should believe the flush-out is completed for a building for both options.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Sachin</title>
		<link>http://www.greenexamacademy.com/eq3-2/#comment-3041</link>
		<dc:creator>Sachin</dc:creator>
		<pubDate>Thu, 02 Jul 2009 13:16:59 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/eq3-2/#comment-3041</guid>
		<description>Hello,
I am not able to get through with building flush out. 
Pre-occupied flush-out: 14000cfm OA per sq.ft. If building area is too large then flush-out time will remain same or it will change? How to decide how much time my building (1Lack sq.Ft.) will take for flush-out?
Occupied flush-out: How to decide the flush-out time for 3500cfm OA per sq.ft until total of 14000cfm OA per sq.ft delivered. 
It says minimum 3500cfm OA per sq.ft. will it be possible to deliver higher cfm than 3500.</description>
		<content:encoded><![CDATA[<p>Hello,<br />
I am not able to get through with building flush out.<br />
Pre-occupied flush-out: 14000cfm OA per sq.ft. If building area is too large then flush-out time will remain same or it will change? How to decide how much time my building (1Lack sq.Ft.) will take for flush-out?<br />
Occupied flush-out: How to decide the flush-out time for 3500cfm OA per sq.ft until total of 14000cfm OA per sq.ft delivered.<br />
It says minimum 3500cfm OA per sq.ft. will it be possible to deliver higher cfm than 3500.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Lule</title>
		<link>http://www.greenexamacademy.com/eq3-2/#comment-2776</link>
		<dc:creator>Lule</dc:creator>
		<pubDate>Thu, 18 Jun 2009 01:11:31 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/eq3-2/#comment-2776</guid>
		<description>Sophia
yes you have to replace the filter prior iaq testing as noted in page 333 of v2.2
&quot;projects should replace media at this point. Finally complete the air test and balancing of the HVAC systems before begining the baseline IAQ testing&quot;
Hope this helps</description>
		<content:encoded><![CDATA[<p>Sophia<br />
yes you have to replace the filter prior iaq testing as noted in page 333 of v2.2<br />
&#8220;projects should replace media at this point. Finally complete the air test and balancing of the HVAC systems before begining the baseline IAQ testing&#8221;<br />
Hope this helps</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Sophia</title>
		<link>http://www.greenexamacademy.com/eq3-2/#comment-2756</link>
		<dc:creator>Sophia</dc:creator>
		<pubDate>Sun, 14 Jun 2009 19:56:53 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/eq3-2/#comment-2756</guid>
		<description>TwinsMommy - I was wondering the same thing about the IAQ plan.  I could not find any clarification in the ref guide.  My guess would be that yes it is the same plan but that the plan has two distinct parts, during construction &amp; before occupancy.  

Regarding the discussion of MERV 8 vs. 13: 

3.1 MERV 8 req&#039;d 
from ref &quot;note that the req&#039;t for MERV 13 filters has been MOVED to c5. This credit does NOT regulate the efficiency of filters used in the operation of the bldg&quot;

3.2 MERV 8 req&#039;d OR MERV 13 (if pursuing c5)
BUT for Option 1 ONLY as far as I can see, not option 2 (IAQ) as this study guide shows? Am I correct on this?

PAT any input?</description>
		<content:encoded><![CDATA[<p>TwinsMommy &#8211; I was wondering the same thing about the IAQ plan.  I could not find any clarification in the ref guide.  My guess would be that yes it is the same plan but that the plan has two distinct parts, during construction &amp; before occupancy.  </p>
<p>Regarding the discussion of MERV 8 vs. 13: </p>
<p>3.1 MERV 8 req&#8217;d<br />
from ref &#8220;note that the req&#8217;t for MERV 13 filters has been MOVED to c5. This credit does NOT regulate the efficiency of filters used in the operation of the bldg&#8221;</p>
<p>3.2 MERV 8 req&#8217;d OR MERV 13 (if pursuing c5)<br />
BUT for Option 1 ONLY as far as I can see, not option 2 (IAQ) as this study guide shows? Am I correct on this?</p>
<p>PAT any input?</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: TwinsMommy</title>
		<link>http://www.greenexamacademy.com/eq3-2/#comment-2720</link>
		<dc:creator>TwinsMommy</dc:creator>
		<pubDate>Thu, 11 Jun 2009 20:26:19 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/eq3-2/#comment-2720</guid>
		<description>Is this IAQ Management Plan part of/a supplement to/the same as the one mentioned in 3.1, or is it an entirely separate document?</description>
		<content:encoded><![CDATA[<p>Is this IAQ Management Plan part of/a supplement to/the same as the one mentioned in 3.1, or is it an entirely separate document?</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Nick G.</title>
		<link>http://www.greenexamacademy.com/eq3-2/#comment-2363</link>
		<dc:creator>Nick G.</dc:creator>
		<pubDate>Thu, 09 Apr 2009 11:23:06 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/eq3-2/#comment-2363</guid>
		<description>Reenu,

A MERV 13 filter only needs to be used IF the building is pursuing EQ5. If the proejct does not need/want EQ 5, any filter that meets the design specs will work.</description>
		<content:encoded><![CDATA[<p>Reenu,</p>
<p>A MERV 13 filter only needs to be used IF the building is pursuing EQ5. If the proejct does not need/want EQ 5, any filter that meets the design specs will work.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Reenu</title>
		<link>http://www.greenexamacademy.com/eq3-2/#comment-2216</link>
		<dc:creator>Reenu</dc:creator>
		<pubDate>Wed, 25 Mar 2009 01:05:15 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/eq3-2/#comment-2216</guid>
		<description>MERV 13 is added to existing HVAC system “post construction” 
Does that mean that it has to be added for 3.2 or it has to be added only if MR 5 is carried out?</description>
		<content:encoded><![CDATA[<p>MERV 13 is added to existing HVAC system “post construction”<br />
Does that mean that it has to be added for 3.2 or it has to be added only if MR 5 is carried out?</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: lisa</title>
		<link>http://www.greenexamacademy.com/eq3-2/#comment-1830</link>
		<dc:creator>lisa</dc:creator>
		<pubDate>Mon, 09 Mar 2009 15:20:12 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/eq3-2/#comment-1830</guid>
		<description>During flush out...
NO CLEANING
NO PUNCH LIST

COMMISSIONING OK IF NO ADDITIONAL CONTAMINANTS ARE INTRODUCED INTO THE BUILDING</description>
		<content:encoded><![CDATA[<p>During flush out&#8230;<br />
NO CLEANING<br />
NO PUNCH LIST</p>
<p>COMMISSIONING OK IF NO ADDITIONAL CONTAMINANTS ARE INTRODUCED INTO THE BUILDING</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: akoak</title>
		<link>http://www.greenexamacademy.com/eq3-2/#comment-1667</link>
		<dc:creator>akoak</dc:creator>
		<pubDate>Sun, 22 Feb 2009 04:12:12 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/eq3-2/#comment-1667</guid>
		<description>What activities can occur during a flush out?</description>
		<content:encoded><![CDATA[<p>What activities can occur during a flush out?</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Irina</title>
		<link>http://www.greenexamacademy.com/eq3-2/#comment-1618</link>
		<dc:creator>Irina</dc:creator>
		<pubDate>Fri, 13 Feb 2009 02:22:42 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/eq3-2/#comment-1618</guid>
		<description>&quot;During each day of the flush-out
period, ventilation shall begin a minimum of three hours prior to occupancy and
continue during occupancy.&quot;
It&#039; not equal to 3 hours per day</description>
		<content:encoded><![CDATA[<p>&#8220;During each day of the flush-out<br />
period, ventilation shall begin a minimum of three hours prior to occupancy and<br />
continue during occupancy.&#8221;<br />
It&#8217; not equal to 3 hours per day</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Brian G</title>
		<link>http://www.greenexamacademy.com/eq3-2/#comment-1091</link>
		<dc:creator>Brian G</dc:creator>
		<pubDate>Tue, 04 Nov 2008 21:35:55 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/eq3-2/#comment-1091</guid>
		<description>I am working as the LEED Manager for a construction company that is using specs written with v2.1 to certify a building under v2.2. Yeah, its not too fun.

Does anyone know how long a typical building flush-out takes for a 20,000 sf building under v2.2? Our specs are calling for a 2-week flush-out, and I&#039;m afraid that the 14,000 cf of O/A per sf of floor area in v2.2 will take longer than 2 weeks, although we haven&#039;t ran the calcs yet. 

Any advice? Please?</description>
		<content:encoded><![CDATA[<p>I am working as the LEED Manager for a construction company that is using specs written with v2.1 to certify a building under v2.2. Yeah, its not too fun.</p>
<p>Does anyone know how long a typical building flush-out takes for a 20,000 sf building under v2.2? Our specs are calling for a 2-week flush-out, and I&#8217;m afraid that the 14,000 cf of O/A per sf of floor area in v2.2 will take longer than 2 weeks, although we haven&#8217;t ran the calcs yet. </p>
<p>Any advice? Please?</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Chris</title>
		<link>http://www.greenexamacademy.com/eq3-2/#comment-1037</link>
		<dc:creator>Chris</dc:creator>
		<pubDate>Wed, 22 Oct 2008 03:14:54 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/eq3-2/#comment-1037</guid>
		<description>The distinction between when to use MERV 8 versus MERV 13 was addressed on least two of my exam questions.  The information in the previous post is correct, except it should say 
...EQc5, MERV 13 (or better) MUST be installed.</description>
		<content:encoded><![CDATA[<p>The distinction between when to use MERV 8 versus MERV 13 was addressed on least two of my exam questions.  The information in the previous post is correct, except it should say<br />
&#8230;EQc5, MERV 13 (or better) MUST be installed.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Chris</title>
		<link>http://www.greenexamacademy.com/eq3-2/#comment-1004</link>
		<dc:creator>Chris</dc:creator>
		<pubDate>Fri, 17 Oct 2008 15:43:15 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/eq3-2/#comment-1004</guid>
		<description>MERV 8 filters installed prior to flush-out will satisfy this credit, EQc3.2 as well as EQc3.1.  

If the project is pursuing EQc5: Indoor Source Control, MERV 13 filters should be installed.</description>
		<content:encoded><![CDATA[<p>MERV 8 filters installed prior to flush-out will satisfy this credit, EQc3.2 as well as EQc3.1.  </p>
<p>If the project is pursuing EQc5: Indoor Source Control, MERV 13 filters should be installed.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Pat</title>
		<link>http://www.greenexamacademy.com/eq3-2/#comment-113</link>
		<dc:creator>Pat</dc:creator>
		<pubDate>Sun, 09 Mar 2008 17:02:25 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/eq3-2/#comment-113</guid>
		<description>Thanks Brian, nice catch here.</description>
		<content:encoded><![CDATA[<p>Thanks Brian, nice catch here.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Brian E</title>
		<link>http://www.greenexamacademy.com/eq3-2/#comment-112</link>
		<dc:creator>Brian E</dc:creator>
		<pubDate>Sun, 09 Mar 2008 15:33:44 +0000</pubDate>
		<guid isPermaLink="false">http://www.greenexamacademy.com/eq3-2/#comment-112</guid>
		<description>On option 2 with occupancy rate should be 3500 CF of air per sf priot to occupancy. Per LEED NC 2.2</description>
		<content:encoded><![CDATA[<p>On option 2 with occupancy rate should be 3500 CF of air per sf priot to occupancy. Per LEED NC 2.2</p>
]]></content:encoded>